TAHALLIUMScientific research archiveIndependent work
Taha Jaafar

Products / 001 / Open-source project

HALIDE
DECANT-01

Automated precipitate washing system.

Experimental device · Documentation in progress

Less time decanting. More time experimenting.

Washing a freshly precipitated solid can mean repeating the same routine over and over: stir, let it settle, pour off the liquid, and add fresh wash liquid. HALIDE DECANT-01 is designed to take over that repetitive work.

This simple system uses two pumps—one to drain the liquid above the settled solid and another to add fresh wash liquid. Used with an overhead stirrer, it can agitate the slurry between washing cycles, helping wash insoluble compounds without relying on a filter funnel or filter paper that can clog with fine particles.

By repeating the mixing, settling, draining and refilling cycle, DECANT-01 is designed to make washing precipitates more convenient and consistent.

How it works

Two independently controlled pumps are connected to an ESP32 microcontroller. The DRAIN channel removes the liquid above the settled precipitate; the FILL channel replaces it with fresh wash liquid. An overhead stirrer can be used to mix the slurry between settling stages.

Recorded pump calibration

The following values are transcribed from the earlier project notes. They are experimental calibration measurements, not manufacturer specifications.

DECANT-01 / Initial calibration record
ParameterDRAINFILL
ESP32 GPIO2526
Test voltage3.00 V3.00 V
Current0.867 A0.881 A
Power2.601 W2.643 W
Flow rate, 30-second tests815 mL/minTo be confirmed

Flow depends on the tubing and operating configuration. The FILL flow rate has not been confirmed; this record does not establish a final system specification.

Project documentation

Design & assembly
STL files for the pump enclosure, enclosure lid and pump holder are available below. Assembly details and product photographs are awaiting publication.
Electronics
DRAIN: GPIO 25. FILL: GPIO 26. Full wiring documentation awaiting publication.
Calibration
Initial measurements recorded above. Final tubing configuration and FILL flow measurements remain to be documented.
Operation
Settling, decanting, refilling and mixing are the intended cycle. Timing and operating instructions are not yet published.
Open-source release
Intended as an open-source project. Three original STL parts are available below. A reuse license has not yet been specified; the downloads do not imply an open-source license.

Files & downloads

Download the original STL files for the pump enclosure, enclosure lid and pump holder.

Original STL files · supplied by Taha Jaafar
FileSizeDownload
pump ENCLOSURE 3D MODEL TO PRINT.stl396.2 KBSTL ↓
pump ENCLOSURE lid 3D MODEL TO PRINT.stl78.8 KBSTL ↓
pump holder 3D MODEL TO PRINT.stl120.4 KBSTL ↓

Download all 3 DECANT-01 parts (ZIP) ↓

STEP files, ESP32 firmware and full technical documentation remain awaiting publication.

All project downloads →